Scope
Flowtesting of 11 dewatering bores for a client in the Kimberley. The bore sites were extremely remote with minimal access and reception available.
Description
- Carry out step testing 4x 60 minute steps
- Carry out 48 hour constant rate test
- Carry out 1 hour recover test post step and constant rate test
- Results were recording using our automated flow testing rig which monitoring and logs flow, pressure, bore level, motor temp, conductivity and PH at pre-determined intervals inline with the client and consulting Hydrologist requirements