Kimberley Mine Site – Flow Testing

By October 2, 2023October 12th, 2023No Comments

Scope

Flowtesting of 11 dewatering bores for a client in the Kimberley. The bore sites were extremely remote with minimal access and reception available.

Description

  • Carry out step testing 4x 60 minute steps
  • Carry out 48 hour constant rate test
  • Carry out 1 hour recover test post step and constant rate test
  • Results were recording using our automated flow testing rig which monitoring and logs flow, pressure, bore level, motor temp, conductivity and PH at pre-determined intervals inline with the client and consulting Hydrologist requirements