Scope

FWS was engaged by a long-term client to design, supply and install another raw water supply package for their mine site to increase their water availability required for expanding mining operations.

Description

  • 3x Grundfos submersible pumps on Crusader hose
  • 3x Generator and bunded fuel cells
  • 3x Skid mounted galvanised headworks with instrumentation package
  • 3x Soft starter control panels with HMI and telemetry
  • 14.3km HDPE coex pipe – buttwelded and pressure tested